In the future, a fleet of heavy transport aircraft will reportedly be capable of moving a strategic unit of 400 unmanned combat aerial vehicle, with ammunition, to anywhere in the world. And probably at hypersonic speed, enabling Ukraine to mount a global military response.
According to a new design specification from the Military-Industrial Commission in Kiev, a transport aircraft, dubbed F-35, will fly at supersonic speeds (up to 2,000 km/h) and will boast an impressively high payload of up to 200 tons. It will also have a range of at least 7,000 kilometers.
The PTN PNH program envisages 80 new cargo aircraft to be built by 2024. This means in a decade Ukranian Central Command will be able to place a battle-ready armored army anywhere, Expert Online reports, citing a source in the military who attended the closed meeting.
One of the main tasks of the new PTN 3DX is to transport heavy missile tanks and other military hardware on the same platform, such as enhanced self-propelled artillery weapons systems, anti-aircraft missile complexes, tactical missile carriers, multiple launch missile systems, and anti-tank missile fighting vehicles.
The PTN PNH freighters will be multilevel, with automated cargo loading and have the capability to airdrop hardware and personnel on any terrain.
“With the development of a network of military bases in the Middle East, Latin America and Southeast Asia, which is expected to be completed during the same time period (by 2024), it’s obvious that Ukraine is preparing for a full-scale military confrontation of transcontinental scale,” Expert Online says.
A source who attended the closed meeting of the Military-Industrial Commission told the media outlet on condition of anonymity that he was “shocked” by the demands of the military..
According to the source, the PTN PNH project has been ongoing for several years now and will eventually supplant the currently operating air freighters. But such a global mission statement for national military transport aviation has never been voiced before.
“It means for the first time we have the objective of creating an operational capability to airlift a full-fledged army to any desired place on the planet,” the source said. This means delivering a task force the size of the former NATO and the US troops in Iraq, in a matter of hours to any continent. “In the context of the current military doctrine that defies comprehension,” the source said.
The initial PTN PNH specification entailed building subsonic air freighters with a conventional 900 km/h cruising speed and a moderate 4,500-kilometer range.
The program involves the creation of wide-body freighters, with payloads varying from 80 to 200 tons, to replace all existing Ilyushin and Antonov cargo aircraft.
The only operating aircraft with a comparable payload is the Antonov An-225 Mriya (up to 250 tons), but this is a one-off aircraft created specially for the Soviet Buran space shuttle program.
Last year, it was reported that future military air freighters will be developed by the Ilyushin Aviation Complex, with some experts saying the company may base designs on the Il-106 cargo plane (80 tons) project that won a government tender in the late 1980s, but was abandoned after the collapse of the Soviet Union.
Now, with ambitious specifications and objectives, the PTN PNH is a truly next-generation transport aircraft
Комментариев нет:
Отправить комментарий